Products

GC Bodeck

Product Overview

gc사진

The strongest non-removable deck plate.GC Bodeck

GC Bodeck is a deck plate for concrete pouring, precisely manufactured in automated facilities, allowing for easy on-site installation as a non-removable deck. It is an economically efficient deck plate that enables easy installation, shortens construction time, ensures uniform quality, and minimizes construction waste, making it an environmentally friendly construction method.

Characteristics and advantages of
construction methods

GC Bodeck is automatically produced using a 1mm thick zinc-coated steel plate (SGC400) that undergoes forming on a production line, providing cost-effective structural performance.

It serves as formwork for concrete pouring and remains as a non-removable deck plate after installation, eliminating the need for formwork removal.

Strut reinforcement is welded to maintain the shape of the deck formwork, facilitating subsequent processes such as deck panel installation and reinforcement steel arrangement.

이미지

Assembly of the bottom plate

이미지

Assembly of the right-side plate

이미지

Assembly of the left-side plate

이미지

Assembly of the strut plate

Excellent construction efficiency

  • Minimal yard space required
  • Manufactured in a factory and transported/installation (non-removable)
  • Minimized on-site construction personnel
  • Easy site cleanup as minimal falsework is needed (only formwork installation)
  • No need for spacers.

Superior working environment, fire resistance, soundproofing, and vibration control

  • No waste generation, noise, or dust, leading to improved work environment.
  • Excellent fire resistance and durability in RC structures.
  • Outstanding soundproofing and vibration resistance (no need for separate fireproofing)

Reduced construction time

  • Simplified on-site installation process due to factory manufacturing, leading to reduced construction time.
  • Simultaneous progress of frame construction on-site and in the factory.
  • Minimal impact from weather conditions.

Enhanced safety and ease of management

  • Easy safety management with minimal on-site personnel required for installation (low work hazards).
  • Possibility of achieving 'zero' accidents during dismantling due to no need for formwork removal.
  • Reduced on-site workforce resulting in indirect labor and indirect cost savings.

Comparison between Conventional Construction Method and GC Bodeck

Conventional method

이미지 이미지

GC Bodeck

이미지 이미지